The next playground. Power.

Land development & data center infrastructureExplore the pipeline ↓France · November 2026

Land can be found.
Electrical power
must be reserved.

We identify sites, negotiate control of the land and document their risks before presenting them. Then we develop them with an investor.

A plot, a connection, a documented feasibility: it is their combination that builds a file worth investing in.

See what we develop ↗

Power,
in perspective.

13 costed files.
Three stages of maturity.

2,129 megawatts of pipeline

  • 869 MW

    Connection committed

    4 files · PTF (technical and financial proposal) signed, site connected or Enedis offer accepted.

  • 720 MW

    RTE studies delivered

    3 files · Exploratory studies received, PTF to be requested.

  • 540 MW

    Under review

    6 files · Requests in progress or files being qualified.

Connection capacities requested or obtained, not weighted by the likelihood of completion. This total does not represent a capacity that is fully connected, available or operational.

Thirteen files.
Distinct trajectories.

The information below reproduces the document supplied, without independent verification. Precise locations and technical documentation are provided under NDA.

The pipeline, file by file

DC-01

Île-de-France

500MW

RTE PTF signed

13-hectare site under control. High-voltage connection validated.

Stage : Connection committedFile under NDA

DC-02

Auvergne-Rhône-Alpes

195MW

RTE PTF signed

Building permit granted. 18 MW available now through a temporary Enedis connection: phased commissioning possible, ahead of full power.

Stage : Connection committedFile under NDA

DC-03

Grand Est

148MW

Site already connected

Former industrial complex of 62 hectares with an existing substation.

Stage : Connection committedFile under NDA

DC-04

Île-de-France

26MW

Enedis offer accepted

Strategic business zone in the inner Paris suburbs.

Stage : Connection committedFile under NDA

DC-05

Pays de la Loire

600MW

RTE study delivered

20 hectares with existing warehouses. Gigawatt-scale power in preparation.

Stage : RTE studies deliveredFile under NDA

DC-06

Bourgogne-Franche-Comté

70MW

RTE study delivered

Notarised land promise signed. Planning compatibility confirmed.

Stage : RTE studies deliveredFile under NDA

DC-07

Auvergne-Rhône-Alpes

50MW

RTE study delivered

Built and let plot, providing immediate rental income with 11 MW from Enedis.

Stage : RTE studies deliveredFile under NDA

DC-08

Bourgogne-Franche-Comté

200MW

RTE PTF expected

Reply expected mid-November 2026. Large campus extendable to 500 MW.

Stage : Under reviewFile under NDA

DC-09

Provence-Alpes-Côte d’Azur

120MW

In qualification

Strategic location in the South. Connection stage under technical audit.

Stage : Under reviewFile under NDA

DC-10

Bourgogne-Franche-Comté

100MW

RTE study requested

2 hectares alongside a motorway. Preliminary architect feasibility completed.

Stage : Under reviewFile under NDA

DC-11

Grand Est

80MW

Promise signed

Land and logistics warehouse together, strong redevelopment potential.

Stage : Under reviewFile under NDA

DC-12

Île-de-France

35MW

In qualification

Technical conversion of a former telecoms site with connectivity already in place.

Stage : Under reviewFile under NDA

DC-13

Centre-Val de Loire

5MW

Enedis line

“AI Factory” retrofit project on an existing business campus.

Stage : Under reviewFile under NDA

The maturity sheets, location and technical documentation of each file are provided under NDA.

Identify.
Secure.
Develop.

  1. Read the territory.

    Qualify the land, the electricity networks, planning and technical constraints on documented data.

  2. Secure the site.

    Negotiate sale promises or LOIs (letters of intent), held by a project company dedicated to each file.

  3. Develop together.

    The investor takes over the project company and finances the acquisition and the development. We steer the steps through to exit.

You bring the capital.
We develop the project.

A co-development model, with a share of the capital gain created.

Contributions first.
Sharing second.

The investor’s contributions — capital and shareholder current accounts — are repaid first out of receipts or refinancings, before any sharing of the capital gain. This priority is not a guarantee that the capital will be recovered.

An example, not a promise.

€100M

Exit price

€40M

Contributions repaid

€60M

Capital gain to share, before costs and tax

€42M

70% of the capital gain for the investor

That is €82M received by the investor: €40M of contributions repaid + €42M of capital gain. The remaining €18M goes to the team. Illustrative example, excluding tax and costs.

Receive the term sheet ↗

A mandate.
Agreed criteria.

An envelope defined with each investor, deployed file by file. The thresholds and conditions still open are to be agreed in the mandate.

Agree the criteria with us ↗
Land control
Sale promise or LOI signed, held in a dedicated SPV.
Grid stage
RTE exploratory study delivered or formal Enedis offer, at a minimum.
Planning
PLU zoning compatible with data centers, with no appeal or major derogation.
Geographic scope
Metropolitan France.

Three founders.
Your partners.

The next file
starts with
a conversation.

  1. NDA

    Mutual confidentiality agreement.

  2. Criteria

    Envelope, power and priority zones.

  3. Mandate

    Co-development terms and governance.

  4. Data room

    Presentation of the eligible, documented files.

  5. Closing

    Takeover of the project company and launch of the development.

Emilien Aubertin · Name disclosed under NDA · Name disclosed under NDA
Access to the data room is under NDA.